They send “bit steep mate.” You are on a roof. The easy reply is “I can do it for £400 less.” That £400 was materials markup, unpaid quoting, or the van. You just paid for their kitchen.
Use when
| What they said | What it usually means | Your move |
|---|---|---|
| Bit high / steep | They have another number, or a budget in their head | Ask what they compared |
| My mate would do it for X | A cash favour, or a different job | Hold the spec. Do not match a mate rate |
| Can you do anything on the price? | They want a discount, not less work | Offer to remove lines, not shave the total |
| We’ll leave it | Not now, or they already booked someone | One calm close. Do not chase |
Copy these
Ask first. Paste this when they have not said why.
Thanks for coming back. Happy to look at it. Was it the total, or a particular line? If you’ve had another price, send the scope and I’ll tell you if we’re quoting the same job.
They want it cheaper, same spec. Offer less work.
I can’t drop the price on the same job — that number already covers the labour, materials, and the bits that go wrong on this type of work. I can take the four doors / extra coat / [optional] off and send a revised figure this afternoon. Which bits do you want to drop?
The number is right. You are letting it go.
Understood. I can’t do that job properly at that figure. If the other quote misses prep / waste / VAT, you’ll feel it on site. If you want it done to this spec later, I’ve got the measure and can pick it up.
What people miss
Matching a screenshot. You did not see their fuse board, their plaster, or whether VAT was in. Matching a JPEG is how you work Sunday for free.
“I’ll knock a bit off.” They will ask again at the end. If you move, write a new quote with a reason — fewer hours, cheaper tap — not a vibe discount.
Writing an essay about your insurance. One line on what is in the number is enough. They are not hiring a lecture.
Arguing on the thread at 9pm. If they are shopping, you will not convert them tonight. Sleep. Reply in work hours.
Related guides
FAQ
- Should I ask what the other quote was?
Ask for the scope, not their shopping list. “Are we quoting the same job?” is enough. You do not need their PDF to hold your number.
- What if they are right and I overpriced?
Then recost. That is a maths error, not a discount. Send a revised quote with the correction, once.
- Can I offer a smaller job as a tester?
Yes, if it is a real smaller job. A “half price to get in the door” is still a fake number.
- They said too high but want to book next week.
Confirm the original figure in writing before you order anything. “Too high” plus a start date is not a new price unless you agreed one.