House Building
QUOTE
Quote for Dave Smith
Extension, labour and materials
| Description | Qty | Unit | Rate | £ |
|---|---|---|---|---|
| Labour, 15 days | 1 | lot | £0.00 | £0.00 |
| Blocks, lintels and cement | 1 | lot | £0.00 | £0.00 |
| Skip and muck away | 1 | lot | £0.00 | £0.00 |
Total: £0
For UK builders
Create professional, fully itemised PDF quotes and invoices in under 60 seconds. No registration or account needed.
A building price is a stack of different money. A round figure called building works is where the customer later remembers a different job from the one you priced.
Fill out the form, generate your quote or invoice, and download a clean PDF directly to your device. Your data is never saved or tracked.
House Building
QUOTE
Quote for Dave Smith
Extension, labour and materials
| Description | Qty | Unit | Rate | £ |
|---|---|---|---|---|
| Labour, 15 days | 1 | lot | £0.00 | £0.00 |
| Blocks, lintels and cement | 1 | lot | £0.00 | £0.00 |
| Skip and muck away | 1 | lot | £0.00 | £0.00 |
Total: £0
Quotes and invoices for extensions, alterations and day rates. You decide your rates. Pencil draws them up in the chat, ready for you to send.

Pencil
Alright Pencil, extension labour for Sarah at 18 Oak Road. Fifteen days at £280, blocks and cement £1,650. Skip is extra.
Quote for Sarah Cole, LS6 2AB
Labour, 15 days£4,200.00
Blocks, lintels and cement£1,650.00
Total: £5,850
Quote for Sarah Cole, LS6 2AB
Labour, 15 days£4,200.00
Blocks, lintels and cement£1,650.00
Skip and muck away£420.00
Total: £6,270
Scaffold hired separately
Use Quote for the extension, the alteration or the labour days before the customer has agreed, and before you order materials or book a skip. Use Invoice when a stage is finished and you are billing the days and the materials already used. The same rows become either document. Only the heading on the PDF changes, which is why this page is both the builder quote template and the builder invoice template.
Tick Add VAT on building work only when the day rate and the materials are net and you are VAT registered. The PDF adds 20% on top and shows net, VAT and the gross. Leave it off if you are not registered. Do not tick it if the figure you agreed on site already includes VAT. Your document is not stored.
Between sites, the same labour-and-materials split is what Pencil for UK builders can draft from the voice note you send before you leave the site.
A builder’s quote is readable when labour, materials and the extras around the build are separate. These lines are an example of extension labour, not a schedule of rates.