Pencil

For UK bathroom fitters

Free Quote & Invoice Generator for UK Bathroom Fitters

Create professional, fully itemised PDF quotes and invoices in under 60 seconds. No registration or account needed.

A bathroom is the suite and the work around it. Making good and hidden damage are what get argued when the paper only says bathroom refit.

Built Specifically for UK Bathroom Fitters

  • Suite & Stages: Separate the tray, bath, furniture and taps from first fix, tanking and second fix.
  • Tiling: Keep tiling on its own line when you are doing it.
  • Hidden Damage: Treat rot or plaster that will not hold the installation as excluded unless the quote says otherwise, and agree the cost before you add it.
  • Changed Products: A product changed after it has been ordered may cost more. Agree that cost under the original terms.

Fill out the form, generate your quote or invoice, and download a clean PDF directly to your device. Your data is never saved or tracked.

Lines

Home Bathroom Fitting

QUOTE

Quote for Sarah Cole

Shower refit

DescriptionQtyUnitRate£
Shower tray and furniture1lot£0.00£0.00
First fix and tanking1lot£0.00£0.00
Wall tiling to the shower1lot£0.00£0.00

Total: £0

Create quotes and invoices from WhatsApp with Pencil assistant

Quotes and invoices for full bathrooms and refits. You decide your rates. Pencil draws them up in the chat, ready for you to send.

  • Turns quick voice notes or scribbled site photos into neat PDFs
  • Invoices sent on the spot so you get paid before you pack up
  • Adjust line items, labour, or VAT on the fly

Pencil

WhatsApp

0:24

Alright Pencil, bathroom at 14 High Street. Tray and furniture £890, first fix and tanking £640. Tiling is separate.

PDFQuote_High_Street_Bathroom.pdfPDF

Quote for bathroom, TN11 8LX

Shower tray and furniture£890.00

First fix and tanking£640.00

Total: £1,530

Add wall tiling to the shower, £420, and second fix £280.
PDFQuote_High_Street_Bathroom_v2.pdfUpdated · PDF

Quote for bathroom, TN11 8LX

Shower tray and furniture£890.00

First fix and tanking£640.00

Wall tiling to the shower£420.00

Second fix£280.00

Total: £2,230

Brassware not chosen yet

Preview of a UK bathroom fitter PDF quote generated with Pencil

Free quote and invoice template for bathroom fitters

Quote the suite and the stages before they choose the brassware, so a later tap is a change to agree. Invoice the stages you agreed, which may fall before the job is fully finished. Keep tiling on its own line when you are doing it.

Tick Add VAT when the suite and the labour are net and you are VAT registered. The PDF adds 20% on top. If they are supplying the furniture, leave it off your lines and only VAT your work. Your document is not stored.

While you are still in the room, Pencil for UK bathroom fitters can price that breakdown from a WhatsApp message.

What to include on a quote for UK bathroom fitters

A bathroom is the suite and the work around it. These lines keep them apart.

  • Shower tray, furniture and taps, supply. The suite, omitted if they are buying it.
  • First fix, tanking and second fix. The labour by stage, not one refit lump.
  • Wall tiling to the shower area. Its own line when you are tiling.

Frequently asked questions

Can a bathroom fitter use this quote generator for free?
Yes. Build the quote before they pick the brassware, or the invoice when you finish, and download the PDF. No account, and your document is not stored.
How do I show VAT on a bathroom suite I am supplying?
Enter the net suite, the net labour and the net tiling, then tick Add VAT if you are registered. The PDF adds 20% and shows it. If the suite is theirs, do not put it on the paper.
Is a bathroom price before the suite is chosen a quote or an estimate?
The labour and the tanking can be a quote. The supply price is an estimate until the tray, the taps and the furniture are chosen. Split them, so a dearer brassware choice does not reopen the fitting price.
Where do boxing in the pipes and making good go?
On the quote, as their own lines, if you are doing them. A paper that only says bathroom refit is where those get argued after the silicone is on.