Pencil Assistant

Setting prices & margins · UK trades

Day rate vs fixed price: Which is better for UK trades?

By Pencil Assistant

Fixed price is better when you can measure the work and you control the site. Day rate is better when you cannot see the time, or they will keep adding “while you’re here”.

Neither is a personality. Both start from the same true hourly rate. A £180 “day” that is really six hours plus two in the van is not competitive. It is unpaid travel.

Customers ask for a number. You like a number because it wins the WhatsApp. Then the job grows and the number does not. Day rate feels awkward to say. It is often the honest product.

Criteria

QuestionFixedDay rate
Can you measure it from a visit or a drawing?YesNo
Do you control access, other trades, drying time?YesNo
Will they change their mind on site?RiskyFits
Is it stripping out, faults, or opening up?RiskyFits
Is it a repeatable install you have done ten times?FitsOptional

Use this when

  • Fixed price: new radiator on a known pipe run, hanging a door in a finished opening, a measured kitchen fit-off. You know the hours within a band you will stand behind.
  • Day rate: first-fix when the carpenter is late, tracing a leak, refurb where every wall is a surprise, a customer who lives on site and “has ideas”.

A day rate is not eight hours of invoice for eight hours of presence. It is chargeable hours that day — often six on the tools after travel — times your true hourly rate. If the rate is £40 and you honestly charge six, the day is £240, not £320 of fiction and not £150 to “get in”.

Day building blockExample
True hourly rate£40
Hours you can actually charge today6
Day rate£240

You can mix: day rate to open up, fixed price once you can see. Write the switch. Do not start “day rate” and silently freeze it when they ask what the total will be — that is a new quote.

Setting your day rate by trade

Published “electrician day rate” or “plasterer day rate” pages are someone else’s average. Region, domestic or commercial, and employed or self-employed all move the number. This page does not list market rates. There is no figure here for what a sparky, a tiler, or a plumber should charge in your town.

Build the day from your own hourly rate. How to calculate your true hourly rate is the floor. A day is that rate times the hours you can honestly charge, after travel and the merchant. The £40 and the hours below are illustrative — the same made-up pair as the table above — not a going rate for any trade.

Situation (illustrative, not a market rate)Chargeable hours in the exampleDay at £40/hr (illustrative)
Mostly local, short travel7£280
Typical van day: travel and a merchant stop6£240
Long trip, one job, home late5£200

Same hourly rate. Different day. A tiler pricing per square metre and a plumber on a day rate are still checking the job against this sum, not against a Facebook comment. If the fixed price for the measured work comes out under the days it will actually take, the fixed price is the problem.

Do not copy a rate from a roundup. If you want a cited employed rate for context, use a named source such as a JIB or trade-body sheet, and say that is employed context, not your sole-trader price. Then go back to your own hourly rate. The hours you can charge are what change by trade and by job: a plasterer who stays on one site all day is not the same day as a sparky with three call-outs and a merchant run. Count your hours. Do not borrow theirs.

What people miss

A cheap day to win the diary. If the day does not carry van, tax buffer, and unpaid quoting, you are buying the job.

Fixed price with no scope. “Decorate the lounge” is not a price. Walls, ceiling, woodwork, filling, number of coats — or it is a day-rate job in disguise.

They heard day rate as a cap. Say that days continue until the written scope is done, or agree a review after two days.

CIS and “cash days”. A day rate is still taxable work. Under CIS, know what is labour. Do not invent a cheaper day because someone asked for cash.

Related guides

FAQ

Which one do customers prefer?

A fixed number. Give it when you can stand behind it. When you cannot, a clear day rate beats a fake total.

Can I charge a half day?

Yes if a half day is actually half the chargeable hours plus travel. A “half day” that still costs a full van run should be a minimum call-out.

Should materials sit inside the day rate?

Usually no. Day rate is labour time. Materials are net plus wastage plus markup.

What if I go faster on a fixed price?

That is the point of a fixed price you measured. You keep the gain. They bought the job, not your clock.

Create quotes and invoices from WhatsApp with Pencil Assistant

Stop spending your Sunday evenings stuck behind a screen with a calculator. Dictate your site notes or snap a photo of your scribbles, and Pencil turns them into clear, professional PDFs you can check and send in seconds.

  • Turns quick voice notes or scribbled site photos into neat PDFs
  • Invoices sent on the spot so you get paid before you pack up
  • Adjust line items, labour, or VAT on the fly
Start your 7-day free trial

Cancel anytime · 7-day trial · Setup in 3 minutes

Pencil Assistant

WhatsApp

0:24

Alright Pencil, need a quote for Dave on High Street. Full repaint of the hall, stairs, and landing. Call it £220 for materials, 3 days labour at £200 a day, plus VAT. Address is 14 High Street, TN11 8LX.

Quote for Dave Smith, TN11 8LXgetpencil.co.uk/q/Quote-for-Dave-Smith

Hall, stairs and landing repainting£600.00

Materials (paint, primer, protection)£220.00

Total: £820+VAT (£984)

Dave just called, he wants the 4 internal doors glossed as well. Add £120 labour for those and set the start date for next Thursday the 8th.
Quote for Dave Smith, TN11 8LXgetpencil.co.uk/q/Quote-for-Dave-Smith

Hall, stairs and landing repainting£600.00

Materials (paint, primer, protection)£220.00

Gloss 4 internal doors£120.00

Total: £940+VAT (£1,128)

Start date: Thursday, 8th October

Great news - Dave accepted your quote. 8-10th October held in your diary.
Preview of a UK decorator PDF quote generated with Pencil Assistant