Pencil

Setting prices & margins · UK trades

How much material wastage should tradespeople build into a quote?

Wastage is extra quantity, not a mood. Measure the net, add a percentage that matches the material, then round up to the pack size the merchant actually sells.

Five percent might cover bricks on a clean run. Ten percent is a common floor for tiles and board. Cuts, breaks, pattern matching, and the last length you cannot buy in centimetres are the leak — not “a bit extra just in case”.

You quoted 18 m² of tiles because that is the floor. The boxes are 1.44 m². You order 13 boxes on the nose. Mid-job you are two tiles short, pattern does not match, and you are back at the merchant in the van. That trip is wastage you refused to put on the quote.

The formula

Buy quantity = net measure × (1 + wastage %) → round up to pack size

MaterialTypical wastage
Facing brick / block (straight walls)5%
Plasterboard, timber lengths8–12%
Ceramic / porcelain tiles (straight lay)10%
Tiles on the diagonal, or a busy pattern15%
Paint (open a new tin rather than run out)1 extra tin
Cable / pipe (bends, drops, offcuts)10%

These are starting points, not a British Standard. A tiny cloakroom with more cuts than field can need more than a long hallway.

Worked example

Hall floor: 18 m² net. Porcelain, straight lay, 10% waste. Box covers 1.44 m².

StepNumber
Net area18.0 m²
Plus 10% waste19.8 m²
Boxes at 1.44 m²13.75
Buy14 boxes

14 boxes — not 13, and not “about 18 m²”.

What people miss

Wastage is not markup. Ten percent more tiles is quantity. Twenty percent on the ticket is handling. Do both, in that order, or you will short the job and still undercharge the run.

Pack size beats the percentage. 13.1 boxes is 14 boxes. The 0.9 leftover still came out of your card.

Pattern and waste are not the same as snagging. A cracked tile in the box is wastage. A customer who changes the border after you have cut it is extra work — quote it.

Leftovers are not a bonus. Half a tin of a discontinued colour is scrap. Price the tin you will actually open.

Related guides

FAQ

Can I skip wastage on a tiny job?
No. A small job has more cuts per square metre. The percentage often goes up, not down.
What if I have leftover from the last job?
Use it if it is the same batch and the customer accepts it. Do not assume last month’s boxes will match.
Should wastage appear as its own line on the quote?
It does not have to. The customer can see a materials quantity that already includes it. You need the working.
Is 10% enough for everything?
No. It is a common tile and board floor. Diagonals, natural stone, and awkward rooms need more.

Create quotes and invoices from WhatsApp with Pencil assistant

Stop spending your Sunday evenings stuck behind a screen with a calculator. Dictate your site notes or snap a photo of your scribbles, and Pencil turns them into clear, professional PDFs you can check and send in seconds.

  • Turns quick voice notes or scribbled site photos into neat PDFs
  • Invoices sent on the spot so you get paid before you pack up
  • Adjust line items, labour, or VAT on the fly
Start 14-day free trial

No credit card required · Cancel anytime · 14-day trial

Pencil

WhatsApp

0:24

Alright Pencil, need a quote for Dave on High Street. Full repaint of the hall, stairs, and landing. Call it £220 for materials, 3 days labour at £200 a day, plus VAT. Address is 14 High Street, TN11 8LX.

PDFQuote_Dave_Decorating.pdfPDF

Quote for Dave Smith, TN11 8LX

Hall, stairs and landing repainting£600.00

Materials (paint, primer, protection)£220.00

Total: £820+VAT (£984)

Dave just called, he wants the 4 internal doors glossed as well. Add £120 labour for those and set the start date for next Thursday the 8th.
PDFQuote_Dave_Decorating_v2.pdfUpdated · PDF

Quote for Dave Smith, TN11 8LX

Hall, stairs and landing repainting£600.00

Materials (paint, primer, protection)£220.00

Gloss 4 internal doors£120.00

Total: £940+VAT (£1,128)

Start date: Thursday, 8th October

Preview of a UK decorator PDF quote generated with Pencil