Short answer: Measure and photograph the roof from the ground, the loft and the scaffold or ladder where it is safe, then record a voice note while the details are fresh. Itemise the quote: scaffold or access, strip and disposal, underlay, battens, tiles or slates, ridges and hips, valleys, flashings, gutters and ventilation. Add what is excluded, how hidden rotten timber will be priced, what happens in bad weather, how long the price stands and what your guarantee covers. Then check it and send it as a written quote the customer can accept.
A roof is one of the easiest jobs to under-quote, because the worst surprises are under the tiles. A clear, itemised quote protects your margin and makes it easier for the customer to say yes. This guide covers what to record on site, how to lay out the quote, and the wording that saves arguments later. It uses the same method as our guide to quoting a landscaping job from your phone.
There are no prices in this guide. Your rates depend on your costs, area and the roof, and a national average cannot settle your price.
Before you climb: safety and what you can see
Do not get on a roof to price it unless you can do it safely. The Health and Safety Executive (HSE), the regulator for workplace health and safety, has guidance on working at height. Much of a survey can be done from the ground, from the loft and from photos.
From the loft, look at the underside of the roof: the condition of the timbers, any daylight through the covering, signs of damp, and whether there is underlay. From outside, note the covering, the pitch, the ridge, hips, valleys, chimney and abutments.
If the building is older, keep asbestos in mind. HSE says asbestos was used in buildings until it was banned in 1999, and buildings constructed after 2000 are unlikely to contain it. Older roof sheets, soffits and other materials may contain it, so do not drill, cut or strip anything you suspect until you know what it is.
What to record on site
Record these in a voice note or a few lines of notes, with photos:
- Roof type and size: pitched or flat, rough dimensions of each slope, the pitch, and the number of storeys.
- Existing covering: concrete tiles, clay tiles, natural or man-made slates, felt or another flat-roof system.
- Ridges and hips: lengths, and whether they are bedded in mortar or dry-fixed.
- Valleys: lengths and type, for example lead, glass-reinforced plastic (GRP) or pre-formed.
- Flashings and abutments: chimney, walls, dormers and roof windows.
- Gutters, fascias and soffits: what is staying and what is being replaced.
- Ventilation: current arrangements and anything the new roof will need.
- What you can see of the timbers and deck, and what you cannot.
- Access: scaffold, the pavement or road outside, neighbours, parking, and space for a skip or waste.
- What the customer wants: a repair, a partial re-roof or a full replacement, and the covering they have chosen.
A voice note in the van can cover all of this in a minute or two. Our guide to what a UK trade quote should include has the general checklist that sits behind any quote.
How to lay out the quote
Break the job into lines the customer can follow. A typical full or partial re-roof quote might include:
| Quote line | What to describe |
|---|---|
| Scaffold or access | Type, how long it is up, and who arranges any licence |
| Strip and disposal | Removing the existing covering, battens and felt, and taking the waste away |
| Underlay or membrane | The product or type and the area covered |
| Battens | Size or grade and the area covered |
| Tiles or slates | The covering chosen, including allowance for cuts and breakages |
| Ridges and hips | Lengths and fixing method |
| Valleys | Lengths and type |
| Flashings | Chimney, abutments and any lead work |
| Gutters, fascias and soffits | Only if included |
| Ventilation | What is being fitted |
| Making good | Clearing up and any repairs around the edges |
Show labour and materials separately where it helps, and keep the total clear. If you are registered for Value Added Tax (VAT), show the VAT and the total the customer will pay.
Scaffold
If you use a scaffold firm, say so. GOV.UK says it is the builder's or scaffolding company's job to get a licence for scaffolding on the highway, including the pavement, and that scaffolding must be checked before first use, every 7 days while it is up, and after alterations, damage or extreme weather. Make it clear on the quote who is arranging this.
Building regulations
Replacing roof coverings can need approval. GOV.UK lists replacing roof coverings on pitched and flat roofs among the alterations that may need building regulations approval in England and Wales. You do not need to get approval yourself if you use someone registered with a competent person scheme. Say on the quote whether building control, or a competent person scheme notification, is included. Scotland and Northern Ireland have their own rules.
Wording that saves arguments
Exclusions and hidden timber
Say clearly what is not included. The most important line on a roof quote is about what you cannot see until it is stripped:
This price assumes the roof timbers and deck are sound. If rotten or damaged timber is found once the roof is stripped, I will show you, and agree the extra work and price with you before doing it.
Weather
Roofing work depends on the weather. If rain or high wind stops work, I will make the roof weathertight and return on the next suitable day. The start and finish dates may move as a result.
How long the price stands
Put a date on the quote. Materials prices move, and a quote that is open forever can be accepted months later. Our guide to quote validity periods explains how long to give.
Guarantee
Only promise what you will honour, and keep your workmanship guarantee separate from any manufacturer's product warranty:
Workmanship guaranteed for [number] years from completion. Materials are covered by the manufacturer's warranty, where one applies.
Deposit and payment
Say how and when you want to be paid, and whether there is a deposit or stage payments. Our guide on how to ask for a deposit covers the wording.
Quoting a householder: cancellation rights
If you agree a job with a householder in their home, or in some cases remotely, they will usually have a right to cancel. Under the Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, a consumer can cancel an off-premises or distance contract without giving a reason, and for a service contract the cancellation period normally ends 14 days after the contract is made.
If the customer wants you to start within those 14 days, the regulations say you must not begin unless they have made an express request, and for an off-premises contract that request must be on a durable medium, such as a letter or email. If you have not given them the required information about the right to cancel, they may not have to pay for work done in that period.
What you write in the quote also matters. Under the Consumer Rights Act 2015, things you say or write about the service can become terms of the contract, so describe what you will do accurately. This is not legal advice. If a job is large or unusual, speak to a solicitor or your trade association.
Sole traders and limited companies: what differs
If you are a sole trader
Put your name and any trading name on the quote, with your contact details. If you trade under a business name, GOV.UK says your invoices must also give an address where legal documents can be delivered, so it makes sense to use the same details on the quote.
If you trade through a limited company
Quote in the company's name. GOV.UK says business letters, order forms and websites must show the company's registered number, registered office address, where it is registered and that it is a limited company. If you name directors, you must name all of them.
Working as a subcontractor
If you are pricing roofing work for a main contractor rather than a householder, the Construction Industry Scheme (CIS) may apply whether you are a sole trader or a company, and if you are both registered for VAT, the VAT domestic reverse charge may change how VAT is shown. Check with your accountant before you price it.
Turning the voice note into a quote with Pencil Assistant
Once you have the details, Pencil Assistant can turn a WhatsApp voice note, message or photo of your notes into an itemised quote. It works in WhatsApp, the app you already use. You check it, change any lines, and get a link to send to the customer yourself. Pencil Assistant never messages your customers. The customer can open the link and accept or decline with a comment, and Pencil tells you when they do. You can book the job into your Google or Apple calendar from the same chat.
You still set the prices and the wording. Pencil Assistant lays them out; it does not decide what the roof is worth. There is more on how Pencil Assistant helps roofers, and a free quote generator for roofers if you want to try one.
